Tourist-rental compliance specialists in Marrakech — free audit and quote +39 351 481 6739
Service · Marrakech and region

Electrical & plumbing compliance Marrakech

Free audit · written quote in 24–48 h · one point of contact through to the licence

Ministerial Order 985-24 · gazetted 27 May 2025 · 24 months to comply

Free audit within 24–48 h

Leave your details: we call you back and book the free audit of your property, at no cost and with no obligation.

We call you back within 24 working hours. No spam, guaranteed.

Decree 2.23.441 requires a technical compliance certificate for the installations — electricity, gas, safety — in the licence file. In riads and in villas built fast during the boom, the diagnosis is often severe: boards from another era, no earthing, basic plumbing, borderline water heaters. We bring the installations up to code with licensed companies: full diagnosis, works targeted on what blocks, compliance certificate issued at the end. Budget: 10,000 to 45,000 DH depending on the starting condition — the line that secures both the file and the guests.

Ministerial Order 985-24: Ministerial Order 985-24 (Official Gazette, 27 May 2025): 24 months to comply, deadline around May 2027. Past that date, law 80-14 bites: fines of 10,000 to 50,000 DH, listings removed from the platforms, activity suspended for repeat offences. Allow 2 to 4 months for a full compliance project and several weeks for the licence file: every week gained now makes the schedule easier.

Free audit
Written quote in 24–48 h
Licensed companies
One point of contact
Price locked in writing

What it costs in 2026: the figures

These are the real market values for 2026, installation included. The exact amount — written and locked — comes after the free survey, which you book in two minutes from this page.

Indicative 2026 prices — Electrical & plumbing compliance (Marrakech)
ServiceIndicative price 2026Notes
Installations diagnosis + written reportfree with the auditblocking points listed, costed
Electrical board compliance3,000–8,000 DHbreakers, RCDs, earthing
Partial electrical rewiring (riad/apartment)12,000–30,000 DHbedroom and bathroom circuits reworked
Plumbing + water-heater compliance5,000–20,000 DHdrains, supply lines, safety
Installations compliance certificateincludedissued by a licensed company after works

2026 reference values for Marrakech and its region. The exact quote — free and firm — is set only after the on-site diagnosis on the 985-24 grid.

Electrical & plumbing compliance — Marrakech

All the work we do: Electrical & plumbing compliance

Ten specialisations, one for each real situation we meet on rental properties. Each page has its own prices, timelines and answers:

How we work: four steps

1

Free on-site legal diagnosis

A specialist — not a salesman — comes in Marrakech and screens your property against law 80-14 and decree 985-24, telling you exactly what is missing.

2

Firm offer, line by line

Within 24–48 h, the written quote: the figure you read is the final one, valid and locked.

3

Coordinated compliance works

Fixed slots, licensed companies, photos at every stage: your property stays rentable as much as possible during the works.

4

Licence and classification

Complete file submitted, administrative follow-up, inspection preparation: until the licence shows on your listing.

What our clients say

“Riad bought in 2023, run without a licence. They took over everything: audit, works, file. Three months later the listing showed ‘licensed’ and my nightly rate went up 20%.”

Salma K. · Marrakech

“Bathrooms created in two patio rooms without touching the tadelakt or the zellige: true Medina specialist work.”

Sophie M. · Marrakech

“Serious people: slots respected, tidy site, and a WhatsApp line that actually answers when the administration asks for a document.”

David K. · Marrakech

Frequently asked questions: Electrical & plumbing compliance

Yes, exclusively: each trade is handled by a licensed company issuing its certificate. That is the condition for the certificates to be admissible in your licence file.

Yes: decree 2.23.441 includes a technical compliance certificate (fire/gas/electricity) among the authorisation file documents. Without it, the file is incomplete and the preliminary inspection fails. We issue it after checking and any works.

Rarely everything: the audit separates what blocks compliance and safety (earthing, RCDs, bathroom circuits, the board) from what is old but acceptable. Usually a targeted partial rewiring is enough — costed line by line before any commitment.

From 2 days for a board and RCDs to 2–3 weeks for a riad partial rewiring. We phase by zone when the property is operating, keeping as many rooms rentable as possible.

Electrical & plumbing compliance: the areas we cover

In Marrakech and across the region, with a free audit — dedicated pages with prices and local context:

Free quote: electrical & plumbing compliance

WhatsApp or the form above: free survey in Marrakech and the region, written offer within 24 hours, price locked in writing.

+39 351 481 6739
WhatsApp Free audit