Electrical & plumbing compliance Marrakech
Free audit · written quote in 24–48 h · one point of contact through to the licence
Ministerial Order 985-24 · gazetted 27 May 2025 · 24 months to complyFree audit within 24–48 h
Leave your details: we call you back and book the free audit of your property, at no cost and with no obligation.
Decree 2.23.441 requires a technical compliance certificate for the installations — electricity, gas, safety — in the licence file. In riads and in villas built fast during the boom, the diagnosis is often severe: boards from another era, no earthing, basic plumbing, borderline water heaters. We bring the installations up to code with licensed companies: full diagnosis, works targeted on what blocks, compliance certificate issued at the end. Budget: 10,000 to 45,000 DH depending on the starting condition — the line that secures both the file and the guests.
Ministerial Order 985-24: Ministerial Order 985-24 (Official Gazette, 27 May 2025): 24 months to comply, deadline around May 2027. Past that date, law 80-14 bites: fines of 10,000 to 50,000 DH, listings removed from the platforms, activity suspended for repeat offences. Allow 2 to 4 months for a full compliance project and several weeks for the licence file: every week gained now makes the schedule easier.
What it costs in 2026: the figures
These are the real market values for 2026, installation included. The exact amount — written and locked — comes after the free survey, which you book in two minutes from this page.
| Service | Indicative price 2026 | Notes |
|---|---|---|
| Installations diagnosis + written report | free with the audit | blocking points listed, costed |
| Electrical board compliance | 3,000–8,000 DH | breakers, RCDs, earthing |
| Partial electrical rewiring (riad/apartment) | 12,000–30,000 DH | bedroom and bathroom circuits reworked |
| Plumbing + water-heater compliance | 5,000–20,000 DH | drains, supply lines, safety |
| Installations compliance certificate | included | issued by a licensed company after works |
2026 reference values for Marrakech and its region. The exact quote — free and firm — is set only after the on-site diagnosis on the 985-24 grid.
All the work we do: Electrical & plumbing compliance
Ten specialisations, one for each real situation we meet on rental properties. Each page has its own prices, timelines and answers:
How we work: four steps
Free on-site legal diagnosis
A specialist — not a salesman — comes in Marrakech and screens your property against law 80-14 and decree 985-24, telling you exactly what is missing.
Firm offer, line by line
Within 24–48 h, the written quote: the figure you read is the final one, valid and locked.
Coordinated compliance works
Fixed slots, licensed companies, photos at every stage: your property stays rentable as much as possible during the works.
Licence and classification
Complete file submitted, administrative follow-up, inspection preparation: until the licence shows on your listing.
What our clients say
“Riad bought in 2023, run without a licence. They took over everything: audit, works, file. Three months later the listing showed ‘licensed’ and my nightly rate went up 20%.”
Salma K. · Marrakech“Bathrooms created in two patio rooms without touching the tadelakt or the zellige: true Medina specialist work.”
Sophie M. · Marrakech“Serious people: slots respected, tidy site, and a WhatsApp line that actually answers when the administration asks for a document.”
David K. · MarrakechFrequently asked questions: Electrical & plumbing compliance
Yes, exclusively: each trade is handled by a licensed company issuing its certificate. That is the condition for the certificates to be admissible in your licence file.
Yes: decree 2.23.441 includes a technical compliance certificate (fire/gas/electricity) among the authorisation file documents. Without it, the file is incomplete and the preliminary inspection fails. We issue it after checking and any works.
Rarely everything: the audit separates what blocks compliance and safety (earthing, RCDs, bathroom circuits, the board) from what is old but acceptable. Usually a targeted partial rewiring is enough — costed line by line before any commitment.
From 2 days for a board and RCDs to 2–3 weeks for a riad partial rewiring. We phase by zone when the property is operating, keeping as many rooms rentable as possible.
Electrical & plumbing compliance: the areas we cover
In Marrakech and across the region, with a free audit — dedicated pages with prices and local context:
Free quote: electrical & plumbing compliance
WhatsApp or the form above: free survey in Marrakech and the region, written offer within 24 hours, price locked in writing.
+39 351 481 6739