Mandatory furnishing & equipment Marrakech
Free audit · written quote in 24–48 h · one point of contact through to the licence
Ministerial Order 985-24 · gazetted 27 May 2025 · 24 months to complyFree audit within 24–48 h
Leave your details: we call you back and book the free audit of your property, at no cost and with no obligation.
Beyond the works, the decree 985-24 grid requires precise fit-out: quality bedding (premium from 4 keys), household linen in hotel quantities, an equipped kitchen, a first-aid kit, wifi, bedroom and bathroom equipment, a complete inventory. It is the line hosts underestimate — and the inspector ticks line by line. We supply and install the complete equipment, calibrated on the target classification, with the regulatory inventory ready for the file. Budget: 15,000 to 80,000 DH depending on the number of bedrooms and the target level.
Ministerial Order 985-24: The legal clock is already ticking: decree 985-24 (Official Gazette, 27 May 2025) gives tourist-rental operators 24 months to comply — the deadline falls around May 2027. After that, law 80-14 applies in full: fines of 10,000 to 50,000 DH, delisting from the platforms and suspension of activity. A compliance project takes 2 to 4 months; a licence file, several weeks. The right time to start is now.
What it costs in 2026: the figures
These are the real market values for 2026, installation included. The exact amount — written and locked — comes after the free survey, which you book in two minutes from this page.
| Service | Indicative price 2026 | Notes |
|---|---|---|
| Equipment pack, 1–2 bedroom apartment | 15,000–30,000 DH | bedding, linen, kitchen, first aid, inventory |
| 3–5 bedroom riad pack (3-key level) | 30,000–55,000 DH | full fit-out per bedroom and common areas |
| High-end 4–5 key pack | 50,000–80,000+ DH | premium bedding, extended equipment, PRM if required |
| Targeted upgrade (beds, linen, first aid) | 3,000–15,000 DH | only what is missing from the grid |
| Regulatory inventory + checklist | free with the audit | the exact list of what is missing |
2026 reference values for Marrakech and its region. The exact quote — free and firm — is set only after the on-site diagnosis on the 985-24 grid.
All the work we do: Mandatory furnishing & equipment
Ten specialisations, one for each real situation we meet on rental properties. Each page has its own prices, timelines and answers:
How we work: four steps
Free on-site legal diagnosis
A specialist — not a salesman — comes in Marrakech and screens your property against law 80-14 and decree 985-24, telling you exactly what is missing.
Firm offer, line by line
Within 24–48 h, the written quote: the figure you read is the final one, valid and locked.
Coordinated compliance works
Fixed slots, licensed companies, photos at every stage: your property stays rentable as much as possible during the works.
Licence and classification
Complete file submitted, administrative follow-up, inspection preparation: until the licence shows on your listing.
What our clients say
“We called them for mandatory furnishing & equipment, then called them back for the air conditioning and the guest register. Nothing more to add.”
Anna S. · Marrakech“After the report I feared the fine. Full regularisation in ten weeks, the listing never went offline.”
Charlotte V. · Marrakech“Before buying the riad, their audit saved me from a disaster: 180,000 DH of hidden works needed for compliance. I renegotiated the price accordingly.”
Charlotte V. · MarrakechFrequently asked questions: Mandatory furnishing & equipment
Hotel-grade mattresses (checked density and comfort), sound bed bases, premium linen: the inspector looks and tests. We supply hotel references, not re-branded consumer bedding — a classic refusal point at high classification.
No: the audit compares what you have against the grid. Often 60 to 80% of the equipment is already compliant; we only cost the gaps — beds to replace, linen to top up, first aid, hairdryer, safe, lock. Nothing superfluous.
Yes, the fit-out statement is among the documents examined: we deliver the signed regulatory inventory of each bedroom and the common areas, ready to attach to the file — and useful for your check-in inventories too.
The grid retains communication means and, for online bookings, working internet access is de facto indispensable — and expected by travellers. We check speed and coverage room by room and install the network if needed.
Mandatory furnishing & equipment: the areas we cover
In Marrakech and across the region, with a free audit — dedicated pages with prices and local context:
Free quote: mandatory furnishing & equipment
WhatsApp or the form above: free survey in Marrakech and the region, written offer within 24 hours, price locked in writing.
+39 351 481 6739